As of: 25 October 2026 · Source: Federal Government draft bill, Bundestag printed paper 21/8027 of 16 September 2026; EnEfG; EDL-G
In brief
Today, Germany's Energy Services Act (EDL-G) requires all companies that are not small or medium-sized enterprises (SMEs) to carry out an energy audit; this obligation has applied since 2015. The Federal Government's draft bill (printed paper 21/8027) would set the audit obligation by energy consumption: it would apply above 2.77 GWh a year, including for SMEs. Under the Energy Efficiency Act (EnEfG) of 2023, an energy or environmental management system would only be needed above 23.6 GWh instead of 7.5 GWh. The bill has not been passed. Until it enters into force, the current obligations apply unchanged.
Where does the legislative process stand?
The bill is called «Gesetz zur Beschleunigung der Umsetzung der Energieeffizienzrichtlinie» (Act to accelerate the implementation of the Energy Efficiency Directive). It implements EU Directive 2023/1791 on energy efficiency and amends the EnEfG and the EDL-G.
25 June 2026: the Federal Government sends the draft to the Bundesrat (Bundesrat printed paper 388/26).
10 July 2026: the Bundesrat gives its opinion on the draft.
16 September 2026: the draft goes to the Bundestag as printed paper 21/8027.
24 September 2026: first reading in the Bundestag.
5 October 2026: public hearing in the Committee on Economic Affairs and Energy.
Open: second and third reading. The act would enter into force on the day after its promulgation (Article 6 of the draft).
The content may still change before it is passed. We will update this article as soon as the Bundestag votes.
What associations and experts say about the amendment
At the hearing of the Committee on Economic Affairs and Energy on 5 October 2026, opinions on the 23.6 GWh threshold were divided. The written statements are on the hearing page.
Business and municipal associations welcome the relief. The DIHK (Association of German Chambers of Commerce and Industry) welcomes the 23.6 GWh threshold and the longer deadlines, and proposes merging the EnEfG and the EDL-G into one act (committee paper 21(9)378). The Association of Towns and Municipalities and the Association of Counties welcome the threshold and want the term «company» clarified for municipal companies (committee paper 21(9)366).
Efficiency and environmental organisations consider the threshold too high. DENEFF (German Business Initiative for Energy Efficiency) proposes 10 GWh instead of 23.6 GWh for the energy management system obligation (committee paper 21(9)358). Umweltinstitut München and Bellona reject the 23.6 GWh and the removal of implementation plans for large consumers (committee paper 21(9)367, committee paper 21(9)396). The Association of German Cities speaks of a «significant weakening» and wants the waste-heat report to remain mandatory (committee paper 21(9)373).
The legal expert considers the thresholds appropriate. Prof. Dr. Sven-Joachim Otto regards 23.6 and 2.77 GWh as compatible with Article 11 of the EU directive. He recalls that the transposition deadline expired on 11 October 2025 and that the European Commission has opened infringement proceedings (committee paper 21(9)368).
The Bundesrat wants implementation plans limited to companies between 2.77 and 23.6 GWh, the deadline extended from three months to one year, and the publication duty removed (Bundesrat printed paper 388/26 (decision), point 25).
For your company this means: the threshold, the deadlines and the implementation plans may still change in committee. Which obligation applies in the end is settled only when the act is passed.
What is an energy audit?
An energy audit is a detailed review of a company's energy consumption: buildings, installations, operating processes and transport. It must comply with DIN EN 16247-1, rest on measured or verifiable consumption data and assess savings measures at least with the net present value method (Section 8a EDL-G). The result is a report with measures, investments and savings. Within two months of the audit, you declare it online to BAFA (Section 8c(1) EDL-G).
What applies today, and what does the draft provide?
Obligation
Today
Under draft 21/8027
Energy audit
All companies that are not SMEs, every four years (Section 8 EDL-G). Companies that used 500,000 kWh or less in the last billing year meet the obligation with an online declaration to the Federal Office for Economic Affairs and Export Control, BAFA (Section 8(4) and Section 8c EDL-G).
All companies with a total final energy consumption above 2.77 GWh, including SMEs, every four years (Section 1 no. 4 and Section 8 EDL-G as amended). The online declaration up to 500,000 kWh lapses; below 2.77 GWh there is no audit obligation any more.
First audit
By 5 December 2015; companies that lose SME status later: no later than 20 months after that (Section 8(2) EDL-G).
No later than twelve months after a company exceeds the threshold, and no earlier than twelve months after entry into force (Section 8(2) EDL-G as amended).
Exemption from the audit
An energy or environmental management system is in place or has been started (Section 8(3) EDL-G).
As today. In addition, for the term of an energy performance contract that meets the requirements (Section 8(4) EDL-G as amended).
Energy or environmental management system
Above 7.5 GWh; the deadline was 18 July 2025 (Section 8 EnEfG).
Above 23.6 GWh. Deadline: 11 October 2027 for companies that exceeded the threshold by the end of 2025, otherwise 24 months. The system must cover at least 90% of consumption (Section 8 EnEfG as amended).
Implementation plans
Above 2.5 GWh, within three years, confirmed externally before publication (Section 9 EnEfG).
For 2.77 to 23.6 GWh, within three months of the energy audit. Updated every year and presented to management. External confirmation is dropped. Companies with a management system are exempt (Section 9 EnEfG as amended).
Waste heat
Companies above 2.5 GWh report their waste heat to the waste heat platform every year by 31 March and inform heating network operators on request (Section 17 EnEfG).
Reporting to the platform only for companies above 23.6 GWh and data centres above 1 MW (Section 17 EnEfG as amended).
Fines
Up to €100,000 if no management system is set up; up to €50,000 for implementation plans, among others (Section 19 EnEfG). Missing energy audit: up to €50,000 (Section 12 EDL-G).
Still up to €100,000 for the management system and up to €50,000 in the other cases (Section 19 EnEfG as amended).
Which obligation applies to your company?
The overview shows which obligation applies from which consumption level, today and under the draft. A company counts as an SME if it has fewer than 250 employees and an annual turnover of no more than €50 million or a balance sheet total of no more than €43 million. Partner and linked enterprises (worldwide) are counted in (Section 1 no. 4 EDL-G; Recommendation 2003/361/EC).
Note: draft bill, not yet passed. As of 25 October 2026
Which obligation applies at which consumption?Total final energy consumption per year (average of the last three calendar years): today and under draft bill printed paper 21/8027
Consumption per year
Today
Under the draft
up to 0.5 GWh (500,000 kWh)
Non-SMEs:online declaration to BAFA
None of these obligations
above 0.5 up to 2.5 GWh
Non-SMEs:energy audit
above 2.5 up to 2.77 GWh
Non-SMEs:energy audit
All:implementation plans, waste heat reporting
above 2.77 up to 7.5 GWh
Energy audit, including SMEs
Implementation plans3 months after the audit
A management system exempts from both
above 7.5 up to 23.6 GWh
Management system
Implementation plans, waste heat reporting
above 23.6 GWh
Management system90% of consumption, deadline 11 October 2027
Waste heat reporting
ℹ️
Important: current law applies until the new act enters into force. Companies that are obliged today remain obliged – including between 7.5 and 23.6 GWh, where the draft no longer requires a management system.
How to determine your total final energy consumption
BAFA explains the calculation in its information sheet on determining total final energy consumption (version of 1 September 2026).
What counts: all energy sources your company uses, for example electricity, natural gas, district heating and fuels. Also self-generated electricity, for example from a photovoltaic system, if you use it yourself.
Where: all owned and rented buildings and sites in Germany, plus machines, plant and vehicle fleet. A rented building counts for the company that uses it.
What does not count, among other things: energy you only pass on to third parties; consumption abroad; transport carried out by third parties; company cars with private use; working from home; energy sources used only as materials.
Groups of companies: unlike the SME question above, the consumption of affiliated companies is not added together: legally independent subsidiaries each count as a separate company.
Reference date for recording energy consumption under the draft would be 1 January of each calendar year.
Implementation plans and cost-effectiveness under DIN EN 17463
An implementation plan lists the saving measures from the energy audit that are cost-effective and shows how far they have been implemented. You publish it, for example on your website or in your sustainability report.
Under the EnEfG, a measure is cost-effective if, under DIN EN 17463 (VALERI), it reaches a positive net present value after no more than half of its useful life (Section 9 EnEfG; Section 9(2) EnEfG as amended). Only measures with a useful life of up to 15 years are considered. The useful life comes from the depreciation tables of the Federal Ministry of Finance; under the draft, it may also be estimated from experience or manufacturer data.
Worked example: the three measures show what a calculation of measures can look like. The figures are illustrative. A useful life of 15 years is assumed for all three. For all three, the net present value is positive after half of the useful life, that is after 7.5 years: all three would be cost-effective and would belong in the implementation plan. The fastest payback comes from cutting the electricity peak load, although it does not save a single kilowatt hour: it cuts electricity costs by €13,500 a year.
Measure
Investment
Savings per year
Payback
Net present value after 7.5 years
Cut the electricity peak load (whole building)
€25,500
€13,5000 kWh0 kg CO₂
1.9 years
€83,200
Replace the compressed-air compressor (compressor room)
€85,000
€16,700111,200 kWh40,000 kg CO₂
5.1 years
€36,400
Switch the lighting to LED (production area)
€96,600
€28,80094,500 kWh33,800 kg CO₂
3.4 years
€111,400
What you should do now
Determine your total final energy consumption for the last three years and place it: up to 2.77 GWh, up to 23.6 GWh or above. Base it on your energy suppliers' bills, for example for electricity, natural gas, district heating and fuels.
Meet the deadlines that apply today. The draft only changes them once it enters into force.
Plan early if you would become subject to the audit obligation, for example as an SME above 2.77 GWh. An energy audit needs consumption data, a site visit and a report. With the data already collected, it goes faster.
In a free initial call, we work out with you which obligation applies to your company, today and under the draft. We tell you which data is still missing, where you can get it and which steps fit your band and your deadlines.
Public bodies: the draft provides for an annual saving of 1.9%; public transport and municipalities would be exempt.
Data centres: new limits for power usage effectiveness (PUE) and obligations on waste heat. Details are in Section 11 EnEfG as amended.
Cost-benefit analysis for waste heat, new under the draft: when industrial installations with more than 8 MW of total energy input are planned or substantially modernised (Section 16 EnEfG as amended).
This article is not legal advice.
Frequently asked questions
Is the reform already in force? Is the current Energy Efficiency Act still valid?
No. As of 25 October 2026, the Bundestag has debated the draft in a first reading and held a hearing, but has not passed it. Until then, the EnEfG and EDL-G apply in their current form.
From what energy consumption would an energy audit be mandatory?
Under the draft, above 2.77 GWh of total final energy consumption a year, averaged over the last three years. Whether a company is an SME would no longer matter.
Does the audit obligation also apply to SMEs?
Not today: the EDL-G only obliges companies that are not SMEs (Section 1 no. 4 EDL-G). Under the draft, yes, as soon as an SME has more than 2.77 GWh of total final energy consumption a year, averaged over the last three years. SMEs below that threshold would still have no audit obligation.
How often does an energy audit have to be carried out?
Every four years, today and under the draft (Section 8 EDL-G; Section 8 EDL-G new). After each audit, you declare it online to BAFA within two months (Section 8c(1) EDL-G). A company that has set up an energy or environmental management system does not need an audit.
By when would the first energy audit have to be completed?
Under the draft, no later than twelve months after your company exceeds the threshold, but no earlier than twelve months after the act enters into force. The draft does not name a fixed date.
Is an energy management system mandatory for companies in 2026?
Today, yes, if your company uses more than 7.5 GWh of final energy a year, averaged over the last three years; the deadline was 18 July 2025 (Section 8 EnEfG). Under the draft, it would only be mandatory above 23.6 GWh, with a deadline of 11 October 2027 (Section 8 EnEfG new). Until the draft enters into force, the 7.5 GWh threshold still applies.
Does an energy management system replace the energy audit?
Yes, today and under the draft. Companies that have set up, or started to set up, an ISO 50001 energy management system or an EMAS environmental management system are exempt from the audit.
Does the consumption of subsidiaries count?
According to the BAFA information sheet, each legally independent company is considered on its own. For affiliated companies, we check this for your case.
What happens if a company does not carry out an energy audit?
BAFA selects companies for spot checks and asks for evidence in writing (Section 8c(2) EDL-G; BAFA: energy audit under the EDL-G). A missing energy audit can lead to a fine of up to €50,000 (Section 12 EDL-G). A company that does not set up a required management system risks up to €100,000 (Section 19 EnEfG). Under the draft, the amounts stay the same.
What happens until the act enters into force?
Current law applies. Companies that must carry out an audit or need a management system today must keep meeting their deadlines.
Sources
All sources are official and were read on 25 or 26 October 2026. The pages or sections this article rests on are given for each. You can download the official documents here as unchanged copies; the originals are published by the bodies named.
German Bundestag: Federal Government draft bill, printed paper 21/8027 of 16 September 2026 – pp. 1–5, 11, 14–15, 17–19, 23, 25 and 36; annex 3 (opinion of the Bundesrat) and annex 4 (the Federal Government's reply). · Download copy (PDF)
German Bundestag: plenary record 21/96, 96th sitting of 24 September 2026, first reading (agenda item 29) – pp. 11972–11976 and annex 13 (pp. 12018–12019). · Download copy (PDF)
German Bundestag: first reading on 24 September 2026, text archive (calendar week 39/2026, «Energieeffizienzrichtlinie»).
German Bundestag: hearing in the Committee on Economic Affairs and Energy on 5 October 2026 with the experts' written statements; report hib 774/2026.
German Bundestag, DIP: procedure 336643, «Act to accelerate the implementation of the Energy Efficiency Directive» – status on 25 October 2026: «Überwiesen» (referred to committee).
Bundesrat: opinion of 10 July 2026 (1067th session), Bundesrat printed paper 388/26 (decision) – in particular point 25 on Section 9 EnEfG (implementation plans and deadlines). · Download copy (PDF)
Energy Services Act (EDL-G) – Sections 1, 8, 8a, 8c, 12, current version (Sections 1, 8a and 8c read on 26 Oct 2026). · Download copy (PDF, as of 25 Oct 2026)
BAFA: page «Energieaudit nach EDL-G, Energie- & Umweltmanagementsysteme nach EnEfG» (in German), read on 26 Oct 2026 – note on spot checks.
European Commission: Recommendation 2003/361/EC of 6 May 2003 concerning the definition of micro, small and medium-sized enterprises (OJ L 124, 20.5.2003, p. 36) – Article 2, read in German on 26 Oct 2026.
BAFA: information sheet on determining total final energy consumption, version of 1 September 2026 – whole document (15 pages, in German). · Download copy (PDF)
Federal Ministry of Finance: AfA tables (depreciation tables).
Co-founder and Chief Technology Officer, EM-OUT. Tito Morales is an industrial engineer (Ingeniero Industrial, Pontificia Universidad Javeriana, Colombia), co-founder of EM-OUT in Stuttgart and its Chief Technology Officer since 2014. He develops the analysis tools EM-OUT uses to evaluate load profiles and consumption. He works on building energy simulations for LEED to ASHRAE 90.1 and on energy audits to DIN EN 16247-1. He writes the expert articles on em-out.de.
ISO 50002-1:2025 is the international energy audit standard; the German EDL-G requires DIN EN 16247-1. What each one covers and which applies to your audit.
What you must report to the BAFA after an energy audit, what it asks for in a spot check, how to tell a registered energy auditor, and who gets the funding.